Development of Safety Planning Using Risk Breakdown Structure to Improve Safety Performance on Construction Project

Development of Safety Planning Using Risk Breakdown Structure to Improve Safety Performance

Authors

  • R.A. Machfudiyanto Department of Civil Engineering, Faculty of Engineering, Universitas Indonesia
  • Y. Latief Department of Civil Engineering, Faculty of Engineering, Universitas Indonesia
  • A. Monang Department of Civil Engineering, Faculty of Engineering, Universitas Indonesia

Keywords:

Safety planning, Risk Breakdown Structure, Construction Project, Safety Performance

Abstract

The bridge construction project, especially at the Elevated Trans Jakarta Road Project is a type of work with high complexity and is located in an open location, so many conditions of the potential hazards may arise. The lack of risks that can be identified and their control in safety planning documents will result in a continually arising job accident rate. The study objectives are to (i) identify the stages of the implementation, as well as the risk factors that have potential hazards, (ii), analyze the dominant risk factors in each stage of activity, and (iii) develop Safety Planning based on Regulation of Minister of Public Works No.05/PRT/M/2014 to improve the safety performance. The study was conducted qualitatively, by analyzing data on the perception of the questionnaire to the respondents who had experience in the project, and then the data were processed by Analytic Hierarchy Process (AHP) to get priority risk factors. The study results showed that there were 65 events of the risks which were identified as potentially dangerous, and 15 dominant risks that affected the OHS performance. Furthermore, the identification of risk response was performed, and risk level review was also conducted the risk response, review results showed a
significant reduction in the risk level. It was concluded that OHS performance increased when safety planning was
structured appropriately which was marked by decreased potential hazards following the applicable risk response.The bridge construction project, especially at the Elevated Trans Jakarta Road Project is a type of work with high complexity and is located in an open location, so many conditions of the potential hazards may arise. The lack of risks that can be identified and their control in safety planning documents will result in a continually  arising job accident rate. The study objectives are to (i) identify the stages of the implementation, as well as therisk factors that have potential hazards, (ii), analyze the dominant risk factors in each stage of activity, and (iii) develop Safety Planning based on Regulation of Minister of Public Works No.05/PRT/M/2014 to improve the safety performance. The study was conducted qualitatively, by analyzing data on the perception of the questionnaire to the
respondents who had experience in the project, and then the data were processed by Analytic Hierarchy Process (AHP) to get priority risk factors. The study results showed that there were 65 events of the risks which were identified as potentially dangerous, and 15 dominant risks that affected the OHS performance. Furthermore, the identification of risk response was performed, and risk level review was also conducted the risk response, review results showed a significant reduction in the risk level. It was concluded that OHS performance increased when safety planning was structured appropriately which was marked by decreased potential hazards following the applicable risk response.

References

D. San Santoso., S.O. Ogunlana, and T. Minato.Assessment of risks in high rise building construction in Jakarta. Engineering, Construction, and Architectural Management. Vol 10(1) 43-55(2003).

S.M. Saleh., S. Sugiarto., A. Hilal, and D. Ariansyah. A study on the traffic impact of the road corridors due to flyover construction at Surabaya intersection, Banda Aceh of Indonesia. In AIP Conference Proceedings (Vol. 1903, No. 1, p. 060005). AIP Publishing LLC. (2014).

S. Kenyon., G. Lyons, and J. Rafferty. Transport and social exclusion: investigating the possibility of promoting inclusion through virtual mobility. Journal of Transport Geography. 10(3), 207-219 (2002).

E.J. Jaselskis., S.D. Anderson, and J.S. Russell. Strategies for achieving excellence in construction safety performance. Journal of construction engineering and management, 122(1), 61-70 (1996).

R.A. Machfudiyanto., Y. Latief., Y. Yogiswara, and R.M.F. Setiawan. (2017, June). Structural equation model to investigate the dimensions influencing safety culture improvement in the construction sector: A case in Indonesia. In AIP Conference Proceedings. 1855(1) 030019. AIP Publishing LLC. (2017).

Y. Latief., R.A. Machfudiyanto., R. Arifuddin., R.M.F. Setiawan, and Y. Yogiswara. Study of evaluation OSH management system policy based on safety culture dimensions in the construction project. In Journal of Physics: Conference Series. 877(1): 012028. IOP Publishing (2017).

R.A. Machfudiyanto., Y. Latief., A. Suraji., and S.Y. Soeharso. Improvement of policies and institutions in developing a safety culture in the construction industry to improve the maturity level, safety performance, and project performance in Indonesia. International Journal of Civil Engineering and Technology. 9(10) 1022-1032 (2018).

A.R. Hale., F.W. Guldenmund., P.L.C.H. Van Loenhout, and J.I.H. Oh. Evaluating safety management and culture interventions to improve safety: Effective intervention strategies. Safety Science, 48(8) 1026-1035 (2010).

A. Hopkins. Thinking about process safety indicators. Safety Science, 47(4) 460-465 (2009)

K.H. Rose. A Guide to the Project Management Body of Knowledge (PMBOK® Guide). Fifth Edition. Project management journal, 44(3) (2013).

A. Charehzehi, and A. Ahankoob. Enhancement of safety performance at a construction site. International Journal of Advances in Engineering & Technology, 5(1) 303 (2012).

Downloads

Published

2021-03-08

How to Cite

Machfudiyanto, R. ., Latief, Y., & Monang, A. . (2021). Development of Safety Planning Using Risk Breakdown Structure to Improve Safety Performance on Construction Project: Development of Safety Planning Using Risk Breakdown Structure to Improve Safety Performance. Proceedings of the Pakistan Academy of Sciences: A. Physical and Computational Sciences, 57(3), 69–76. Retrieved from https://ppaspk.org/index.php/PPAS-A/article/view/15

Issue

Section

Articles