Identification of Failure Modes on Electrostatic Chuck through Reliability Centered Maintenance: A Case Study

Identification of Failure Modes on ESC through RCM

Authors

  • Mehroz Sana Mechanical Engineering Department, University of Engineering & Technology Lahore KSK Campus, Pakistan
  • Umer Saleem Mechanical Engineering Department, University of Engineering & Technology Lahore KSK Campus, Pakistan
  • Muhammad Farooq Mechanical Engineering Department, University of Engineering & Technology Lahore KSK Campus, Pakistan
  • Adnan Qamar Mechanical Engineering Department, University of Engineering & Technology Lahore KSK Campus, Pakistan
  • Muhammad Mehmood A Bhutta Mechanical Engineering Department, University of Engineering and Technology, Lahore, Pakistan
  • Saad Zafar United Energy Pakistan, Karachi, Pakistan

Keywords:

Backside cooling,, computerized maintenance management system,, decision making grid, dry vacuum pump, electrostatic chuck, reliability centered maintenance

Abstract

Quality of any reliability analysis depends strongly on the analyst’s ability to identify all required functions. Failure is a basic concept of any reliability analysis. Also, the plant equipment’s reliability is of vital importance in any production operation. The objective of the present study was to investigate the failure modes of critical systems in the manufacturing process of micro-chips by using Reliability Centered Maintenance (RCM) technique. In industries, RCM is employed to decide maintenance strategies using reliability data. The most critical component of the system was found to be Electrostatic Chuck (ESC) used in etching process. This technique was helpful in reducing the failure modes of critical equipment. Analyses were performed to observe the improvement in the system’s efficiency.Downtime data was collected due to various faults in critical equipment. In the current research, various RCM analysis were performed on electrostatic chuck to ensure that shifting the maintenance technique to RCM would increase the revenue generation for the industry. This analysis was performed in Texas Instruments, UK. The results for optimum life of equipment, obtained after performing RCM, were quite high. Proper scheduling and planning improved the time of productive maintenance from 25% to 35%. Planning through Computerized Maintenance Management System (CMMS) boosted the efficiency up to 90%. The obtained results were compared with the current maintenance techniques; e.g., corrective maintenance. Solutions were recommended for the identified modes of failures and ways to eliminate the factors that cause failures on ESC.

References

Moubray, J. Reliability-centred Maintenance. Butterworth-Heinermann, Oxford, United Kingdom (1991).

Manouchehrabadi, M., K., RCM: Wind Power Project Management (WPPM). University of Gotland, Wind Energy Department, Gotland (2011).

Chen, Y. & T. Zhang. Application and development of reliability-centered maintenance (RCM) in china’s nuclear energy field”, Proceedings of International Conference on Quality, Reliability,Risk, Maintenance and Safety Engineering, 543 pp.(2012).

Nowlan F.S. & H. F. Heap . Reliability-centered Maintenance, Technical report AD/A066-579. National Technical Information Service, US Department of Commerce, Springfield, Virginia,(1978).

Ying, M., B.Wanga, C. Kwai-Sang, G.K. Poonb. Risk evaluation in failure mode and effects analysis using fuzzy weighted geometric mean, Institute of Soft Science, Fuzhou University, China (2009).

Weir, B., Computerized Maintenance Management Systems: “An Impartial View of CMMS Functions,Selection and Implementation”, CMMS (2009).

TI, Plasma Etch: Used, Surplus, Refurbished Equipment For Sale, Auctioned and Wanted. Texas,United States (2012).

Garg, A., S.G., Deshmukh, (2006), “Maintenance management: literature review and directions”,Journal of Quality in Maintenance Engineering, Vol.12 Iss: 3, pp.205 – 238, (2006).

Ebara-Pumps, 1-2 Cochrane Square, Brucefield Industrial Estate, Livingston EH54 9DR, Ebara Pumps UK, Ebara, Ebara Europe, Surface and submersible pumps. (2013).

Reason J. Managing the risks of organisational accidents. Aldershot: Ashgate Publishing Ltd.; 1998.

Downloads

Published

2021-04-02

How to Cite

Sana, M. ., Saleem, U. ., Farooq, M. ., Qamar, A. ., A Bhutta, M. M. ., & Zafar, S. . (2021). Identification of Failure Modes on Electrostatic Chuck through Reliability Centered Maintenance: A Case Study: Identification of Failure Modes on ESC through RCM. Proceedings of the Pakistan Academy of Sciences: A. Physical and Computational Sciences, 55(2), 21–32. Retrieved from http://ppaspk.org/index.php/PPAS-A/article/view/168

Issue

Section

Articles